| Granting body | CITY OF AMARILLO, TEXASCITY OF AMARILLO, TEXAS | 1 |
| Contracting entity | ALBERS AEROSPACE HOLDINGS LLCALBERS AEROSPACE HOLDINGS LLC | 1 |
| Parent / guarantor | Not stated in the agreement | — |
| Instrument | CHAPTER 380 ECONOMIC DEVELOPMENT PROGRAM AGREEMENTCHAPTER 380 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT | 1 |
| Capital investment | $790,000$790,000 | 3 |
| Grant or incentive | $300,000.00three hundred thousand dollars ($300,000.00) | 4 |
| Jobs committed | 50 recital language, not a covenantemploy an additional 50 employees | 1 |
| Wage requirement | Not stated in the agreement | — |
| Square footage | 156,526 sq. ft.with an approximate building area of 156,526 sq. ft. | 3 |
| Acreage | Not stated in the agreement | — |
| Performance deadline | January 31, 2027Improvements will be completed and installed no later than January 31, 2027 | 3 |
| Expiration | Not stated in the agreement | — |
| Effective date | the last date this Agreement is signed by either Party“Effective Date” means the last date this Agreement is signed by either Party. | 2 |
| Signatory | Name not legible in the scanned copy | 8 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
Demolish existing 1200 Amp service and install (1) 800 Amp service to feed RTU Units. Demolish existing 800 Amp switchgear in weld shop and install new 2500 Amp 480V switchgear. Install new 1200 Amp:480V switchgear in weld shop and demolish existing switchgear if needed. Install new 600 Amp: 480V panel in Main West Shop to feed future equipment & 150 KVA transformer. Demolish existing 1200 Amp 120/208V switchgear and install 2000 Amp switchgear. Install 150 KVA transformer and 120/208V 400 Amp panel in main west shop. Install new CT cans and main disconnects as required by code for 2500 Amp 480V, 800 Amp 480V, and 2000 Amp 120/208V switchgears. Install new LED Hi-Bay lights in main west shop, including conduit and wire. Install 120 GFCI receptacles in various locations, including conduit and wire. Install surge protection on all 3 services. Provide all testing, permits, and engineering s
Open the signed agreement (PDF, Texas Comptroller) →
Agreement 0014792 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This page was read by machine. For a specific agreement, I read the signed PDF and send back every obligation, deadline and repayment clause, quoted with its page.