The Abatement RegisterAmarilloAgreement 0014792
Texas Chapter 380 / 381 agreement · Amarillo

ALBERS AEROSPACE HOLDINGS LLC

Agreement 0014792, filed with the Texas Comptroller by CITY OF AMARILLO, TEXAS.

Checked against the signed agreement on 11 Nov 2026.

$790,000committed capital investment
$300,000.00grant or incentive
January 31, 2027performance deadline
The obligation

What the contract requires.

“Improvements will be completed and installed no later than January 31, 2027”Executed agreement, p. 3
“employ an additional 50 employees”Executed agreement, p. 1
“$790,000”Executed agreement, p. 3
The repayment remedy

What happens if it is not met.

“the Company will owe the City repayment of the previous Program Grant Payment made to the Company, plus interest at the rate Applicable Rate”Executed agreement, p. 5

Where a deadline above has passed, we have not found a public record of whether it was met. That is not evidence of non-compliance. Texas does not require one to be published.

Every field, as the contract states it

The record.

FieldValue & quoted sourcePage
Granting bodyCITY OF AMARILLO, TEXASCITY OF AMARILLO, TEXAS1
Contracting entityALBERS AEROSPACE HOLDINGS LLCALBERS AEROSPACE HOLDINGS LLC1
Parent / guarantorNot stated in the agreement—
InstrumentCHAPTER 380 ECONOMIC DEVELOPMENT PROGRAM AGREEMENTCHAPTER 380 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT1
Capital investment$790,000$790,0003
Grant or incentive$300,000.00three hundred thousand dollars ($300,000.00)4
Jobs committed50 recital language, not a covenantemploy an additional 50 employees1
Wage requirementNot stated in the agreement—
Square footage156,526 sq. ft.with an approximate building area of 156,526 sq. ft.3
AcreageNot stated in the agreement—
Performance deadlineJanuary 31, 2027Improvements will be completed and installed no later than January 31, 20273
ExpirationNot stated in the agreement—
Effective datethe last date this Agreement is signed by either Party“Effective Date” means the last date this Agreement is signed by either Party.2
SignatoryName not legible in the scanned copy8
Chain statusTerminal document — no later agreement in the registry names this one as its predecessor—
Project components · p. 9

Demolish existing 1200 Amp service and install (1) 800 Amp service to feed RTU Units. Demolish existing 800 Amp switchgear in weld shop and install new 2500 Amp 480V switchgear. Install new 1200 Amp:480V switchgear in weld shop and demolish existing switchgear if needed. Install new 600 Amp: 480V panel in Main West Shop to feed future equipment & 150 KVA transformer. Demolish existing 1200 Amp 120/208V switchgear and install 2000 Amp switchgear. Install 150 KVA transformer and 120/208V 400 Amp panel in main west shop. Install new CT cans and main disconnects as required by code for 2500 Amp 480V, 800 Amp 480V, and 2000 Amp 120/208V switchgears. Install new LED Hi-Bay lights in main west shop, including conduit and wire. Install 120 GFCI receptacles in various locations, including conduit and wire. Install surge protection on all 3 services. Provide all testing, permits, and engineering s

How to check this page

Every line above is in the contract.

Open the signed agreement (PDF, Texas Comptroller) →

Agreement 0014792 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.

Where the contract says nothing, the field is left empty rather than filled with a guess.