Agreement 0011973, filed with the Texas Comptroller by City of Socorro.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | City of SocorroThat the City Manager be authorized to sign a Chapter 380 Economic Development Program Agreement ("Agreement") by and between the CITY OF SOCORRO ("City") and Wiwynn Technology Corporation, a Texas Corporation ("Applicant") | 2 |
| Contracting entity | Wiwynn Technology Corporation, a Texas CorporationThat the City Manager be authorized to sign a Chapter 380 Economic Development Program Agreement ("Agreement") by and between the CITY OF SOCORRO ("City") and Wiwynn Technology Corporation, a Texas Corporation ("Applicant") | 2 |
| Parent / guarantor | Not stated in the agreement | — |
| Instrument | Chapter 380 Economic Development Program AgreementThis Chapter 380 Economic Development Program Agreement ("Agreement") is made and entered into by and between the City of Socorro, Texas | 3 |
| Governing chapter | Chapter 380, Local Government Code<<<PAGE 1>>> City of Socorro Special Council Meeting June 2, 2024 Page 4 DATED THIS 28" OF MAY, 2025 Ou71r2eAA By: Olivia Navarro, City Clerk y S-B2C@ fiw Agenda posted: Removed: Time: by: <<<PAGE 2>>> RESOLUTION 826 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SOCORRO: That the City Manager be authorized to sign a Chapter 380 Economic Development Program Agreement ("Agreement") by and betwee | — |
| Capital investment | $64,000,000$64,000,000 in building improvements | 5 |
| Grant or incentive | $1,255,399.24The City shall provide economic incentives not to exceed $1,255,399.24 in the form of a Personal Property Tax Grant. | 2 |
| Jobs committed | 514 figure taken from a schedule, not from covenant languagecreating 514 new full-time jobs | 20 |
| Wage requirement | $17.31 /hr.meet the Median County Wage (El Paso County) currently, $17.31 /hr. | 20 |
| Square footage | Not stated in the agreement | — |
| Acreage | 56.49 acresApproximately 29.67 acres known as Lot 2, Block 1, Socorro Logistics Center Unit Two...Approximately 26.82 acres (the “Land”), being Lot 1, Block 1, Socorro Logistics Center Unit Two | 16 |
| Performance deadline | 24 months after the Effective DateWithin 24 months after the Effective Date, Applicant shall submit Grant Submittals to the City to verify the following | 6 |
| Expiration | Not stated in the agreement | — |
| Effective date | June 6, 2025Date: Durne 6, 2029 | 15 |
| Signatory | Joseph Jui Chang HsuName: Joseph Sur Chong, Hse | 15 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
The new facility will include the design, manufacture, and assembly of high-density computing and storage products.
Agreement 0011973 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.
Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.