Agreement 0009016, filed with the Texas Comptroller by CITY OF ARLINGTON, TEXAS.
The remedy here is discretionary — the clause says it may be applied, not that it must be.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | CITY OF ARLINGTON, TEXASCITY OF ARLINGTON, TEXAS, a home-rule city and municipal corporation of Tarrant County, Texas | 1 |
| Contracting entity | espace Inc.espace Inc., Corporation (hereinafter referred to as “Company”) | 1 |
| Parent / guarantor | Not stated in the agreement | — |
| Instrument | Master AgreementTHIS MASTER AGREEMENT (hereinafter referred to as “Agreement”) | 1 |
| Governing chapter | Chapter 380, Local Government Codeand WHEREAS, Chapter 380 of the Local Government Code provides statutory authority for establishing and administering the Program provided herein; | — |
| Capital investment | Not stated in the agreement | — |
| Grant or incentive | Twenty-Five Thousand Dollars ($25,000)The total cumulative amount of the Arlington Hire Grants provided under this Subsection II.F., shall not exceed Twenty-Five Thousand Dollars ($25,000). | 4 |
| Jobs committed | Four Hundred (400)Company (including any Subsidiaries) shall create and fill no less than Four Hundred (400) Full Time Jobs | 8 |
| Wage requirement | Ninety-Five Thousand Dollars ($95,000)with a minimum average annual salary of Ninety- Five Thousand Dollars ($95,000) | 8 |
| Square footage | Two Hundred and Fifty Thousand (250,000) square footProject” shall mean approximately Two Hundred and Fifty Thousand (250,000) square foot manufacturing facility | 2 |
| Acreage | Not stated in the agreement | — |
| Performance deadline | sixty (60) months after construction of the Project has been completedno less than Four Hundred (400) Full Time Jobs, with a minimum average annual salary of Ninety- Five Thousand Dollars ($95,000), at the Project no later than sixty (60) months after construction of the Project has been completed. | 8 |
| Expiration | Not stated in the agreement | — |
| Effective date | 2024, 2024 (hereinafter referred to as “Effective Date”) | 1 |
| Signatory | Pras LYONPras LYON CHAD iN COL? Stee Ies7 | 12 |
| Chain status | Superseded by agreement 0009858, 0010497 | — |
Agreement 0009016 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.
Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.