Agreement 0006098, filed with the Texas Comptroller by GRAYSON COUNTY, TEXAS.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | GRAYSON COUNTY, TEXASGRAYSON COUNTY, TEXAS, a political subdivision of the State of Texas ("County") | 1 |
| Contracting entity | GLOBITECH INCORPORATEDGLOBITECH INCORPORATED, a Delaware corporation ("GlobiTech") | 1 |
| Parent / guarantor | Not stated in the agreement | — |
| Instrument | economic development grantseconomic development grants (each a “Grant’’) to GlobiTech | 2 |
| Governing chapter | Chapter 312, Tax Code, and Chapter 380/381, Local Government CodeWHEREAS, Section 312.002 of the Texas Tax Code requires the County to adopt a resolution indicating the County’s desire to become eligible to participate in tax abatement agreements; | — |
| Capital investment | Not stated in the agreement | — |
| Grant or incentive | Not stated in the agreement | — |
| Jobs committed | 100employ and maintain no fewer than 100 Employment Positions in Phase II-B | 3 |
| Wage requirement | Not stated in the agreement | — |
| Square footage | Not stated in the agreement | — |
| Acreage | 143 acresapproximately 143 acres of land more particularly described on Exhibit A | 1 |
| Performance deadline | January 1, 2032cause Commencement of Construction of the Phase II-B Improvements to occur on or before January 1, 2032 | 20 |
| Expiration | Not stated in the agreement | — |
| Effective date | 7-20-2022Date: 7-20-2022. | 12 |
| Signatory | Mark EnglandPrinted Name: Mark England | 12 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
Phase II-B would include a multi-floor building of manufacturing and manufacturing support space, support buildings including crystal puller building, chemical/gas building, central utilities building, and an admin building in support of the manufacturing operations. Several additional detached structures would be constructed to house additional necessary infrastructure for the manufacture of 300mm wafers, including parking areas, water treatment facility, reactive and non-reactive gas pads, cooling towers, DIW plant, on-site powering solar panels, and an electrical substation.
Agreement 0006098 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.
Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.