The Abatement RegisterBrazosAgreement 0005105
Texas Chapter 380 / 381 agreement · Brazos

RELLIS Campus Data and Research Center, LLC

Agreement 0005105, filed with the Texas Comptroller by Brazos County.

50%of ad valorem taxes abated
The obligation

What the contract requires.

“mally ‘Sotiplete construction of the Project within ighten (08) two, de ot th ihe : ‘Commencement of Constmction Date.”Executed agreement, p. 6

The date in this field is not fully supported by the sentence quoted beside it, usually because the scan is damaged or the contract states a period rather than a date. It is shown as read, flagged, and not relied on.

The remedy

What the contract says happens.

“the County’ shall have:the right to recap! ( ‘ncenti Term of this Agréement by County to Developer.”Executed agreement, p. 10

Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.

Abatement schedule · ad valorem taxes · p. 8

What was abated, and for how long.

fifty percent (50%)

A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.

Every field, as the contract states it

The record.

FieldValue & quoted sourcePage
Granting bodyBrazos CountyCountyof Brazos, Texas,.a political subdivision of the State of Texas, (* County”)1
Contracting entityRELLIS Campus Data and Research Center, LLCRELLIS CAMPUS DATA AND RESEARCH CENTER, LLC1
Parent / guarantorNot stated in the agreement—
InstrumentChapter 381 Economic Development Program AgreementCHAPTER 381 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT1
Governing chapterChapter 381, Local Government Code_ STATEOFTEXAS ~—s_ 8 COUNTY OF BRAZOS § | CHAPTER 381 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT | BETWEEN.—
Capital investmentNot stated in the agreement—
Grant or incentiveMaximum Payment Amounttotal amount of Chapter 381 Payments: paid: under this : Agreement st shall not exceed thé. Maximum Paymenit Amount.8
Jobs committedNot stated in the agreement—
Wage requirementNot stated in the agreement—
Square footage225,000construction ofa a new, -aproximitely 225, 000s square ft: data a venir4
Acreage23Land”: shall pian the ie Eprexicnately 23. Acres: 8:6F Van located4
Performance deadlineeighteen (18) months date not fully supported by the quoted sentencemally ‘Sotiplete construction of the Project within ighten (08) two, de ot th ihe : ‘Commencement of Constmction Date.6
Expiration2025or 2025, whichever occurs: first.3
Effective dateNot stated in the agreement—
SignatorySam TenorioRELLIS Cainpus Data, and Research Centar, LLC Att ‘Sam Tenorio, UL12
Chain statusTerminal document — no later agreement in the registry names this one as its predecessor—
How to check this page

Every line above is in the contract.

Agreement 0005105 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.

Where the contract says nothing, the field is left empty rather than filled with a guess.

One of 1,645

Which of these are on your book?

This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.

Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.

[email protected]