Agreement 0004668, filed with the Texas Comptroller by Andrews County, Texas.
The remedy here is discretionary — the clause says it may be applied, not that it must be.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | Andrews County, TexasAndrews County, Texas (the "County") | 1 |
| Contracting entity | 2W Permian Solar, LLC2W Permian Solar, LLC, a Delaware Limited Liability Company. | 1 |
| Parent / guarantor | Lincoln Clean Energy, LLC2W Permian Solar LLC c/o Lincoln Clean Energy, LLC | 16 |
| Instrument | Tax Abatement AgreementTAX ABATEMENT AGREEMENT | 1 |
| Governing chapter | Chapter 312, Tax Code (property tax abatement)TAX CODE §312.002(d), that this Agreement should be entered into notwithstanding any such inconsistency, and (ii) constitute a major investment in the Reinvestment Zone that will be a benefit to the Reinvestment Zone and will contribute to the economic development of the County. | — |
| Capital investment | $203,900,000Modules 5203,900,000 | 25 |
| Grant or incentive | Not stated in the agreement | — |
| Jobs committed | four (4) new full-time jobsOwner agrees, during the Abatement Period to provide not fewer than four (4) new full-time jobs | 6 |
| Wage requirement | Not stated in the agreement | — |
| Square footage | Not stated in the agreement | — |
| Acreage | approximately 3,000 acresProject area consists of approximately 3,000 acres | 33 |
| Performance deadline | December 31, 2022will be substantially completed on or before December 31, 2022 | 2 |
| Expiration | December 31, 2032will terminate on December 31 of the tenth (10") year following the Commencement Date | 3 |
| Effective date | July 22, 2019effective as of the 22nd day of July, 2019 | 1 |
| Signatory | Eric S. BarnettThis instrument was acknowledged before me on the _/S— day of AYA TA ‘hp S Toore wary of 2W Permian Solar LLC, on behalf of said company. se, ERIC 8. BARNETT SEL, | 21 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
solar modules/panels, metal mounting system with tracking capabilities, underground conduit, communication cables, electric collection system wiring, combiner boxes, a project substation including breakers, a transformer, and meters, overhead transmission lines, inverter boxes on concrete pads, operations and maintenance facility, fencing for safety and security, telephone and internet communication system, access and service roads, and meteorological equipment to measure solar irradiation and weather conditions
Agreement 0004668 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.
Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.