Agreement 0004218, filed with the Texas Comptroller by HOPKINS COUNTY, TEXAS.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | HOPKINS COUNTY, TEXASHOPKINS COUNTY, TEXAS, a Texas political subdivision (hereinafter referred to as "County") | 1 |
| Contracting entity | STAMPEDE SOLAR PROJECT, LLCSTAMPEDE SOLAR PROJECT, LLC a Delaware Limited Liability Company (hereinafter referred to as the "Developer") | 1 |
| Parent / guarantor | Enel Green Power North America Inc.Attn: Enel Green Power North America Inc. | 11 |
| Instrument | Program GrantProgram Grant or Program Grant Payment. The words "Program Grant" or "Program Grant Payment” mean the economic development grants paid by the County to Developer | 3 |
| Governing chapter | Chapter 381, Local Government Code<<<PAGE 1>>> EXHIBIT ig HOPKINS COUNTY CHAPTER 381 ECONOMIC DEVELOPMENT PROGRAM AND AGREEMENT This CHAPTER 381 ECONOMIC DEVELOPMENT PROGRAM AND AGREEMENT (hereinafter referred to as the "Agreement") is made and entered into by and between HOPKINS COUNTY, TEXAS, a Texas political subdivision (hereinafter referred to as "County"), and STAMPEDE SOLAR PROJECT, LLC a Delaware Limited Liability Company | — |
| Capital investment | $274,800,000.00capital investment of more than Two hundred seventy four million eight hundred thousand no/100 dollars ($274,800,000.00) | 1 |
| Grant or incentive | Not stated in the agreement | — |
| Jobs committed | 5Developer agrees to create five (5) new Full-Time Equivalent Employment Positions | 1 |
| Wage requirement | Not stated in the agreement | — |
| Square footage | Not stated in the agreement | — |
| Acreage | 1,300Property. The word "Property" means the approximately 1,300 acre tract or tracts of land in Hopkins County, Texas | 3 |
| Performance deadline | December 31, 2022Developer covenants and agrees to complete construction of the Project by December 31, 2022. | 4 |
| Expiration | December 31, 2032shall continue thereafter until December 31, 2032, unless terminated sooner under the provisions hereof. | 2 |
| Effective date | September 2021This instrument was acknowledged before me on the G Haay of Se ja fEV ¥ Nord Yv , 2021, by Megan Beauregard | 14 |
| Signatory | Megan BeauregardBy: Megan Beauregard | 14 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
Solar Modules and Panels, Inverter Boxes, Meteorological Equipment, Operation and Maintenance Building, Electrical Substations, Associated Towers, Storage Systems, Racking and Mounting Structures, Combiner Boxes, Foundations, Roadways, Paving and Fencing, Generation Transmission Tie Line, Interconnection Facilities, Power Conditioning Equipment
Agreement 0004218 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.
Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.