Agreement 0004085, filed with the Texas Comptroller by City of Iowa Park, Texas.
This clause ends the agreement. It states no repayment of money already received.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | City of Iowa Park, TexasThis second moditication (this “Modification”) of the Tax Abatement Agreement dated November 1, 2011 (the “Agreement”) is entered into effective the day of : 2013 by the City of Iowa Park, Texas (the “City”) and S-5! Manufacturing, L.L.C., a Colorado limited liability company (“Owner”), | 2 |
| Contracting entity | S-5! Manufacturing, L.L.C.This second moditication (this “Modification”) of the Tax Abatement Agreement dated November 1, 2011 (the “Agreement”) is entered into effective the day of : 2013 by the City of Iowa Park, Texas (the “City”) and S-5! Manufacturing, L.L.C., a Colorado limited liability company (“Owner”), | 2 |
| Parent / guarantor | Metal Roof Innovations, Ltd.City of lowa Park, Texas S-5! Manufacturing, L.L.C. By: Metal Roof Innovations, Ltd., its Manager | 3 |
| Instrument | Tax Abatement AgreementThis second moditication (this “Modification”) of the Tax Abatement Agreement dated November 1, 2011 (the “Agreement”) is entered into effective the day of : 2013 by the City of Iowa Park, Texas (the “City”) and S-5! Manufacturing, L.L.C., a Colorado limited liability company (“Owner”), | 2 |
| Governing chapter | Chapter 312, Tax Code (property tax abatement)TAX CODE §312.208. | — |
| Capital investment | Not stated in the agreement | — |
| Grant or incentive | Not stated in the agreement | — |
| Jobs committed | ten (10) Full Time Jobsand agrees that it will maintain not fewer than ten (10) Full Time Jobs at the West Highway Property, throughout the remainder of the Abatement Period. | 2 |
| Wage requirement | Not stated in the agreement | — |
| Square footage | twenty-five thousand square footadditional time to formulate and prepare plans and specifications for a new twenty-five thousand square foot facility to be located in the City’s Industrial Park | 4 |
| Acreage | Not stated in the agreement | — |
| Performance deadline | Not stated in the agreement | — |
| Expiration | Not stated in the agreement | — |
| Effective date | 2013This second moditication (this “Modification”) of the Tax Abatement Agreement dated November 1, 2011 (the “Agreement”) is entered into effective the day of : 2013 by the City of Iowa Park, Texas (the “City”) and S-5! Manufacturing, L.L.C., a Colorado limited liability company (“Owner”), | 2 |
| Signatory | Rob HaddockBy: Rob Haddock, President of Metal Roof Innovations, Ltd. | 3 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
Agreement 0004085 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.
Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.