Agreement 0002403, filed with the Texas Comptroller by Polk County, Texas.
The remedy here is discretionary — the clause says it may be applied, not that it must be.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | Polk County, TexasTAX ABATEMENT AGREEMENT Between POLK COUNTY, TEXAS and LONE SPUR SOLAR ENERGY LLC | 1 |
| Contracting entity | Lone Spur Solar Energy LLCTAX ABATEMENT AGREEMENT Between POLK COUNTY, TEXAS and LONE SPUR SOLAR ENERGY LLC | 1 |
| Parent / guarantor | InvenergyPolk County 312 Reinvestment Zone โ Lone Spur Solar Energy LLC Polk County, Texas September 24, 2021 Invenergy | 23 |
| Instrument | Tax Abatement AgreementTAX ABATEMENT AGREEMENT | 1 |
| Governing chapter | Chapter 312, Tax Code (property tax abatement)TAX CODE ยง312.002(d), that this Agreement should be entered into notwithstanding any such inconsistency, and (ii) constitute a major investment in the Reinvestment Zone that will be a benefit to the Reinvestment Zone and will contribute to the economic development of the County. | — |
| Capital investment | Not stated in the agreement | — |
| Grant or incentive | Not stated in the agreement | — |
| Jobs committed | One (1) new full-time jobOwner agrees to provide and maintain during the Abatement Period, not fewer than One (1) new full-time job | 5 |
| Wage requirement | Not stated in the agreement | — |
| Square footage | Not stated in the agreement | — |
| Acreage | 1,200 acreswill be sited on up to approximately 1,200 acres | 29 |
| Performance deadline | December 31, 2024will be substantially completed by December 31, 2024 | 2 |
| Expiration | Not stated in the agreement | — |
| Effective date | September 28, 2021effective as of September 28, 2021 | 1 |
| Signatory | Jonathan SaxonJonathan Saxon Senior Vice President of Development Lone Spur Solar Energy LLC | 41 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
- approximately 225,000 โ 325,000 solar modules/panels - 20 โ 40 inverters - metal mounting system with tracking capabilities - battery or battery system - underground conduit - communications cables and electric system wiring - combiner boxes - a project substation including breakers -a transformer and meters - overhead transmission lines - control house - an operations and maintenance facility - fencing for safety and security - telephone and internet communication system - meteorological equipment to measure solar irradiation and weather conditions.
Agreement 0002403 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
This is a single agreement. I have read 1,645 of the 4,428 Texas has filed, resolved which have been superseded, and recorded what each commits a company to.
Send me an entity and a county and I will tell you what is on it — quoted, page-cited, checked. Free for the first one.